welcome to anhui constructionengineering group-和记娱乐怡情博娱

projects performance
projects performance

anhui construction engineering group overseas co.,ltd.

anhui construction engineering group contracting branch

anhui construction engineering group architectural design &  reserch institute

anhui first construstion engineering co. ltd.

anhui second construction engineering co.ltd.

anhui sanjian engineering co.,ltd

anhui road & bridge group co.,ltd

anhui hydro development co., ltd.

anhui road & bridge engineering group co. ltd.

anhui road & bridge construction co. ltd.

anhui road & harbor engineering co.,ltd

anhui industrial plant installation co. ltd.

anhui construction  engineering group technician college

anhui construction  engineering group real-estate development co.,ltd

anhui construction machinery co.,ltd

anhui communication & waterway engineering co.,ltd.

anhui construction  engineering group building material co. ltd.

anhui construction  engineering group investment management co. ltd.

anhui construction  engineering group financing center

anhui construction  engineering group commercial factoring  co., ltd.

 
projects performance
  
infrastructure under-construction on ppp basis – national highway g206
fontsize:      
  2018-01-30   hits:6227  source:aceg invest.   author:admin.

the national highway g206 shucheng section is with a length of 23.1km starting from the interchange overpass named shuqing in shucheng county and ending at the boundary with county tongcheng .

the designed speed is 80km/h for the main road with a width of 24.5m and 60km/h for the urban trunk road with a width of 32m.

the initial shareholder of this project is tongyun transportation construction investment co., ltd. in shucheng county, accounting for 20% of the shares and the social capital - anhui construction engineering group co., ltd. accounting for 80% of the shares.

the total investment of the project is rmb 840 million yuan and the construction cost is rmb 688.5 million yuan. the total construction period is 18 months and the operation period is 10 years.

the project commenced in january 2017 and the scheduled completion date will be in july 2018.

 

和记娱乐app下载 copyright 2016 by anhui constructionengineering group
address:no.459 huangshan road,hefei,anhui,china zp:23001
tel: 86 551 62865001 62865017 62872714 fax: 86 551 62865001 62865020 62877722
网站地图